Production & facilities
Industrial process. Botanical care.
Reception, drying, cutting, separation, baling and dispatch run as one documented flow under ISO 22000 and HACCP.
01 — Equipment
Magnetic foreign-material removal
In-line magnetic separation removes metallic foreign material before grading and packing.
One flow, audited end to end
Every stage is documented and traceable, from incoming lot to dispatched bale.
02 — Facilities & infrastructure
8,000 m², completed 2022.
€5M+ invested in the last five years across buildings, processing lines and energy — on a 25,000 m² industrial site in Vidhas, Elbasan.
Storage capacity of 3,000–3,500 tonnes keeps harvest peaks and shipping schedules apart — volume commitments hold year-round.